Pump Pre Hire

Delivery Method?
Client Off Load?
Is the Site in a Marine Area?
Is a Site Survey Required?
HIAB Access Available?
Are there Tight Angles?
If Pump is Electric is there a Sufficient Power Supply Nearby:
Is a Generator Required
How is the pump to be started?
Product Being Pumped?
Discharge pipes?
If there is an existing discharge line, bends or valves in the line?
Is Noise Level an Issue?
Refueling
Security?
Remember: If the Suction lift is greater than 6m or 7m look at electric options. To select a generator, get the max power consumption of the Pump and times it by 3 to work out the kVA required to start. Eg: 8kw x 3 = 24kVA. Larger Gensets go up in 5kVA lots, so in the above case a 25kVA Generator will be required.

* Note: Your Email Will be kept Safe and Sound